Grading & Leveling

Graded and leveled - Complex yard with many trees and obstacles

Graded and Leveled ~0.5 acre (very rocky soil and tough ground)

Pool Pad Leveling (entire areas flat within 1", excavated the hole on the right too)

Shed Pad Build and Leveling (entire areas flat within 1") 

0.5 Acre New Yard Grading and Leveling

0.5 Acre Grade and Level - Major Cleanup (separate branches from dirt), Remove Old Shed Base, Fill Large Holes, Spread Out dirt piles, Level and Grade area

Cleared yards of weeds/debris; Graded and leveled the yards

0.4 Acre, Weeds were  4 feet to 6 feet tall in entire yard

0.5 Acre, cut up a couple downed trees, stacked them on back property line, cleared all weeds (many 6 feet tall), graded and leveled the entire yard (above and below are back and front of yard)